CO2 Calculator > Calculator > Assumptions

Assumptions

Parameter

Open Cut Scenario

Pipe Jacking Scenario

 

 

Feasibility (& default)

As Designed

As Built

Feasibility (& default)

As Designed

As Built

 

Materials

 

Number of shafts/manholes
One at each end plus one every 100 m.
Specified by user.
Specified by user.
One at each end plus one every 100 m.
Specified by user.
Specified by user.
 
Depth to invert
Equal across length of pipe, minimum 1.5 m depth.
Equal across length of pipe, minimum 1.5 m depth.
 
Material exclusions
N/A
Gaskets, pointing & caulking (assumed to be insignificant quantities generated). Material contribution of interjacks to CO2e assumed to be zero (reusable).
 
Trench support
Steel plates, 6 mm thickness along trench sides, material contribution to CO2e assumed to be zero (reusable).
N/A
 
Trench fill
Virgin aggregate where “imported fill” specified.
N/A
 
Spoil
70% soil (active) and 30% rubble (inert).
 
Asphalt
300 mm thickness of asphalt applied where a highway site location is specified.
N/A

 

Installation

 

Number of machine hours
 
 
Site closure duration (days) minus two (for setup and dismantling) multiplied by 8 operating hours (per day).
Specified by user.
Site closure duration (days) minus two (for setup and dismantling) multiplied by 8 operating hours (per day).
Specified by user.
 
Machinery fuel type
Diesel (runs generator and excavator).
Diesel (runs generator, crane and air compressors in some setups).
 
 
 
Groundwater pump
Assumed to operate if groundwater presence specified.
 
Groundwater pump hours
Site closure duration (days) minus two (for setup and dismantling) multiplied by 24 operating hours (per day).
 
Ground  type (work rate of machinery)
Rock (high – 0.7); Cohesive (medium – 0.54); Non-Cohesive (low – 0.38).

 

Transport

 

One way transport distances
Aggregates – 41.9 km; Asphalt – 40.1 km; Apparatus – 113.5 km; Spoil – 30 km; Trench support – 100 km (x2 for drop-off and collection).
Specified by user.
Specified by user.
Aggregates – 41.9 km; Asphalt – 40.1 km; Apparatus – 113.5 km; Spoil – 30 km.
Specified by user.
Specified by user.
 
Vehicle types
Aggregates, asphalt, spoil – Rigid HGV > 17 t; Apparatus, trench support – Articulated HGV > 33 t.
 
Vehicle utilisation
50% for all journeys
 
Exclusions
Emissions from the transport of plant and staff to and from site are excluded.

 

Traffic

 

Site location (daily traffic level)
Minor Road – Rural (1000); Minor Road – Urban (2000); A Road – Rural (10000); A Road – Urban (20000); Non-Highway (0).
N/A – assumed that pipe jacking operations are located off highway to minimise traffic disruption. Shafts located in roundabouts, footways and on brown or industrial land.
 
Site length
Rounded-up to nearest 50 m + 50 m e.g. 132 m pipe would be 200 m site length.
Specified by user.
N/A
 
Road type
2-way single carriageway all purpose (S2AP)
N/A
 
Junction length
1 km
N/A
 
Side roads intersecting
2 per km
N/A
 
Closure type
24 hour closure across site closure duration (days)
N/A
 
Speed limit
30 mph
N/A
 
Proportion of HGVs
5%
N/A
 
Converting carbon cost to mass
Use the 2011 non-traded central value in WebTAG (£158.87 per t of carbon)
N/A